On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
An Atlanta based engineering firm asked Fibrelite to solve a problem for the CDC location in Atlanta GA. The facility has a new diesel fueling fuelling facility where vehicles are fueled. fuelled. They wanted to have easy access to their overspill vault set across the street from the loading facility.
Fibrelite’s heavy duty trench covers to be installed directly on a newly made concrete trench crossing the street.
Heavy duty trench on the street allows street traffic to drive over and offers a low weight solution to the Center Centre of Disease Control’s complex needs. Fibrelite’s range of heavy duty covers was designed for such an application. The main requirement for access the containment vault were met.
Author: