On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
A major UK construction company required a covering solution for a newly constructed culvert. This was located close to a pedestrian walkway area so would have frequent pedestrian traffic. Due to the shape and dimensions, it required a “cassette” of bespoke covers and additional support beams.
When Fibrelite was approached the culvert was already under construction. The challenge was to provide a bespoke “cassette” of specifically shaped covers to fit the existing culvert along with the appropriate support beam structure within a limited time frame.
The Fibrelite “cassette” was designed, engineered and installed to the specified time frame. The covers supplied were molded moulded to shape in the Fibrelite factory and supplied as a complete unit ready for installation.
The covers are maintenance free and suitable for a safe two-person manual lift employing the supplied ergonomically designed Fibrelite lifting handles, allowing lifting from waist level preventing back injuries. As the covers are located very close to a pedestrian walkway area the standard Fibrelite tread pattern provided the perfect slip resistance required.
Author: