On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
JOD Engineering Services LTD approached Fibrelite looking for a lightweight covering solution to replace their existing heavy covers, the client supplies fresh water to millions of homes across the North West of England.
Ease of access to services below the trench was an issue due to the weight of the covers, making removal and replacement of the covers difficult and time consuming as specialist machinery was required.
Fibrelite designed and supplied custom trench covers to fit directly into the existing frames:
The client is now able to gain access to the trench pits quickly and easily without the need for any specialist machinery:
Author: