On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
Fibrelite was approached by a third-party contractor on behalf of the client who was looking to replace their outdated camera pit covers at a football stadium in London, which were no longer meeting health and safety standards.
The thin plastic decking was unsuitable for its intended use:
Fibrelite provided a bespoke covering solution for the client to meet their onsite requirements with no major upheaval to existing onsite facilities:
Installation was completed in accordance with the client’s construction program, programme, Fibrelite assisted with the process to ensure a smooth transition.
Author: