New case study:
EV bus depot, London

This London EV bus depot required a swift replacement for their heavy concrete trench covers over their HV cable trench to remedy manual handling issues. Fibrelite supplied a custom engineered and manufactured modular trench cover solution which could be retrofitted directly within the precast rebate. The cost saving benefits of this proposal was of great interest to the contractor (who specializes specialises in the renewable and low carbon energy sectors) and the end user.

Featured:
D400 FRP GRP Composite Trench Covers

Read the full case study here.
Author:
Picture of Aaron McConkey

Aaron McConkey

Author Bio
Share this story on
LinkedIn