On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreCadent Gas continues to replace their previously installed heavy cast iron with concrete infill trench covers with Fibrelite’s lightweight retrofit GRP composite covers which can be installed directly into the existing apertures.
Read Moreerpecnews Editor Nick Needs recently interviewed our Sales Director, OPW Retail Fuelling EMEA, Denis Pokrovsky, to discuss our growth into new markets. “The Middle East and Africa have slightly different…
Approximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations…
With a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
The previously installed concrete trench access covers over an oxygen pipework trench at this hospital were causing a number of issues due to both their weight and deterioration.
Fibrelite provided a lightweight retrofit replacement for failing heavy concrete trench access covers over an existing oxygen pipework trench at this UK hospital.
The Fibrelite technical team attended the site to conduct a full survey, following which they custom-designed and manufactured a bespoke retrofit covering solution which fit directly into the existing frames.
This hospital now has a trench access covering solution which can be safely and quickly removed manually by two people and will provide many years of trouble-free service.