On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
Indiana University approached Fibrelite looking for steam rated manhole covers for new vaults and in replacement of existing covers on the Bloomington campus. The covers protect vaults that provide steam through two miles of tunnels across the campus.
The previously installed metal covers made access difficult, the adverse conditions of steam vaults had caused the locking mechanisms to fail.
The covers would heat up due to the steam vaults below, creating a health and safety hazard and putting the students and maintenance staff at risk of burning themselves.
Fibrelite provided lightweight retrofit manhole covers which were heat resistant, eliminating potential health and safety risks. Fibrelite’s lockable covers can be removed and replaced using the FL7 lifting handle, preventing the need for heavy lifting equipment to remove and replace the covers. This was important on this project as regular access was required.
Fibrelite’s heat resistant covers provided Indiana University with a reliable solution enabling safe and easy access to vaults, the customer is now planning to replace other metal covers and install many more Fibrelite covers across campus to reduce health and safety risks for students and maintenance staff.