On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read Moreerpecnews Editor Nick Needs recently interviewed our Sales Director, OPW Retail Fuelling EMEA, Denis Pokrovsky, to discuss our growth into new markets. "The Middle East and Africa have slightly different...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations…
With a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
Fibrelite’s bespoke lightweight composite trench covers have recently been installed over a service trench at the primary railway maintenance depot for the Docklands Light Railway. These were installed to give quick and easy access to the service trench.
Fibrelite had two major issues to deal with when installing and manufacturing the retrofit solution. Firstly, the concrete rebate was dimensionally inconsistent throughout, causing an undulating surface. Secondly, high and low voltage cables running through the trench also had to come out of the trench to the switch boards in various positions along the trench.
Fibrelite supplied and installed an encapsulating frame that directly fitted into the existing rebate. Fibrelite’s experienced site team was able to provide a solution to correct the inconsistent trench using Epoxy Resin to level the surface to ensure the frame and trench panels fitted flush.
Fibrelite also manually cut and re sealed the appropriate trench panels allowing the electricity cables to run out of the trench to reach the correct switch boards.
This retrofit project presented a number of challenging problems which needed to be overcome. Fibrelite designed and manufactured large bespoke panels the longest of which was 1.6m long, reducing the total number of panels required to cover the trench.
Fibrelite’s dedicated team of site engineers assisted with the installation of the covers, as they were required to be cut and re-sealed to accommodate service cables.
This project was completed in short amount of time, making the installation process both quick and efficient, which is just one of the many benefits of choosing Fibrelite.
Author: