On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
In our latest case study, Fibrelite was approached by Cadent Gas to provide a long-lasting trench cover solution, which would alleviate some onsite issues associated with previously installed concrete covers at Winwick Road, Warrington. The key issues were unsafe manual handling and slow/inefficient access to valve pits.
In response, Fibrelite provided D400 composite trench covers which do not contribute to the erosion of any components within the trench over time and can easily be manually removed by two people using Fibrelite FL7 lifting handle. This makes sure time is no longer wasted when conducting necessary work within the trench, as was previously the case during removal/replacement of cumbersome covers.
Read the full case study here
Featured In
Construction UK – download the PDF here.