On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
Fibrelite provided a lightweight replacement for previously installed heavy (15cm thick) concrete/steel infill covers at an intersection in the center centre of Innsbruck, Austria.
Removing the previously installed covers was time consuming due to the covers’ weight (approximately 100kg). A specialized specialised tripod was needed to lift the covers, which was both costly and time consuming. Because the covers were situated on a well used road it was essential to minimize minimise maintenance time and subsequent disruption to traffic.
In the installation, the oil company used the Fibrelite S14-390-D400 chamber system and KPS piping. The chamber extensions were laminated at the factory before dispatch, reducing the onsite installation time which was a priority. Even with the extensions they are fully vacuum testable and watertight.
KPS piping provides a safe, easy-install solution requiring the minimum possible number of welds. KPS double wall piping requires fewer welds than any other system available, as the compact KPS fittings weld both walls of a double wall pipe simultaneously, again reducing installation time.
Fibrelite’s trench cover design allows covers to be lifted out without specialized specialised lifting equipment. All Fibrelite trench covers can be easily removed by two people using the Fibrelite FL7 lifting handles.