On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
Approximately 625 meters metres of custom designed and manufactured Fibrelite FRP GRP trench covers and frames were specified for this project at one of the UK’s largest power stations. Customization, Customisation, manual handling and longevity were the key requirements, including nonstandard frame sections consisting of laser fusion welded and hot dip galvanized galvanised steel.
The Fibrelite Technical team worked closely with end user’s nominated Design Engineering Company and the third-party contractor to produce and deliver a custom designed solution which would meet all requirements and specifications.
Featured:
– Heavy Duty D400 Trench Covers