Fibrelite was approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project. The end user had previously considered...
Read MoreFibrelite was approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project. The end user had previously considered...
Read MoreIn this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
Read MoreThis large multinational satellite services provider specified the Fibrelite Trenwa partnership trench and cover system for their latest satellite earth station antenna facility in the U S
Once in a while a product will come along whose performance will drive a change in standards across entire industries Like stainless steel Or concrete Or a trench cover which
Fibrelite provided this regional UK airport with an upgrade for their access covers over their off apron runway lighting pits Ease of access to the runway 8230
Petro Systems Management (PSM) has upgraded from using steel pipework in their installations to using KPS conductive plastic piping, enabling simple, fast, long lasting installations, especially when used in conjunction with Fibrelite tank sumps and seal kits as pictured here.
The customer (Petro Systems) traditionally installed petrol station sites in Ireland with steel pipe. With an eye on the future, and to help their installation team, Petro Systems wanted to move towards using plastic conductive pipe for forthcoming installations, making the switch from the old, heavy, labour intensive, traditional method of working with steel pipes.
Petro Systems already used OPW gauges and were familiar with the OPW team and the quality of OPW products; so when upgrading to plastic pipe (the now industry standard), they chose KPS.
OPW provided classroom and practical training at the offices of Petro Systems before the project started to familiarise the installation team with the products and the theory behind electrofusion welding before going on site.
When the first site was under construction, the OPW team were again on hand to offer expert onsite installation training and guidance for all the OPW products used including KPS pipes and Fibrelite sumps.
KPS piping proved to be the perfect solution for Petro Systems. The client has now moved from a traditional steel piping to a modern long-lasting plastic conductive pipe.