On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreCadent Gas continues to replace their previously installed heavy cast iron with concrete infill trench covers with Fibrelite’s lightweight retrofit GRP composite covers which can be installed directly into the existing apertures.
Read Moreerpecnews Editor Nick Needs recently interviewed our Sales Director, OPW Retail Fuelling EMEA, Denis Pokrovsky, to discuss our growth into new markets. “The Middle East and Africa have slightly different…
Approximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations…
With a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
Petro Systems Management Ireland (PSM) already used OPW gauges and were familiar with the OPW team and the quality of OPW products; so when upgrading to plastic pipe (the now industry standard), KPS was the obvious choice.
OPW provided classroom and practical training at the offices of PSM before the project started and during the first site construction, offering expert onsite installation training and guidance for all the OPW products used including KPS pipes and Fibrelite sumps.
Read the full case study here