Fibrelite simplifies BP site construction with new Fibrelite sump and KPS Piping

BP approached us to provide a simple fill solution for their more compact UK sites. In response, we developed a new range of FRP GRP below ground remote fill systems!

The new sump and corbel utilized utilised some items from our existing product range to deliver a unique while cost effective solution. Installer friendly KPS petrol piping was used to connect the remote fill sumps to petrol tanks and dispenser sumps. The new Fibrelite sump systems, incorporate a sump and offset corbel with alternate pipe exit positions to ensure consistent fill layouts for tanker deliveries.

The system reduces costs while creating a safe sealed solution of the highest standard available. These remote fill sumps are now being specified for a number of BP sites around the UK.

Fibrelite’s below ground remote fill systems with factory fitted/tested dual contained and conductive KPS pipework
All integrated KPS fittings weld both pipe walls simultaneously
Author:
Picture of Aaron McConkey

Aaron McConkey

Author Bio
Share this story on
LinkedIn