On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
BP approached us to provide a simple fill solution for their more compact UK sites. In response, we developed a new range of FRP GRP below ground remote fill systems!
The new sump and corbel utilized utilised some items from our existing product range to deliver a unique while cost effective solution. Installer friendly KPS petrol piping was used to connect the remote fill sumps to petrol tanks and dispenser sumps. The new Fibrelite sump systems, incorporate a sump and offset corbel with alternate pipe exit positions to ensure consistent fill layouts for tanker deliveries.
The system reduces costs while creating a safe sealed solution of the highest standard available. These remote fill sumps are now being specified for a number of BP sites around the UK.