On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
A Romanian oil company approached us for an easy to install, reliable above ground fill point solution including associated internal equipment (pipework and fill caps) that would perform for the life of the site, allowing safe, quick fuel delivery.
We provided a maintenance-free solution built to perform for the lifetime of the site. Our vacuum testable FRP GRP above ground remote fill sump protects against water ingress (or fuel exit) and unauthorized unauthorised entry, while allowing easy access for fuel delivery (eliminating the need for individual seal cap locks). The composite material is impervious to corrosion, ensuring continued performance. Installer friendly KPS piping connects fill points and remote fill minimizing minimising installation time. Finally, OPW tight-fill top-seal caps, were installed on top-seal adapters, adaptors, assuring a positive, water and vapor-tight vapour-tight seal.