The below ground sumps and associated fuel piping at this UK military vehicle refuelling facility were due for replacement as part of an underground risk management upgrade.
Read MoreThe below ground sumps and associated fuel piping at this UK military vehicle refuelling facility were due for replacement as part of an underground risk management upgrade.
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
The below ground sumps and associated fuel piping at this UK military vehicle refueling refuelling facility were due for replacement as part of an underground risk management upgrade. The facility required a retrofit liquid tight replacement which could be fitted to their existing FRP GRP fuel tanks.