On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
To meet the demands of an increasing population, this major airport in the North of England is undergoing major redevelopment.
Fibrelite FRP GRP composite covers have been specified for a second installation in this development: a retrofit replacement for previous installed concrete recess covers over sewage systems, making access simpler and safer.
Fibrelite were pleased to play a part in this major project which will see the highest quality of suppliers from every industry leave their mark on this bustling facility.
The previously installed heavy concrete recess covers were showing signs of severe corrosion, adding to the difficulty and manual handling risks when removing and replacing covers for essential monitoring and maintenance.
Key considerations:
Visually, these covers were an eyesore and were not in keeping with the aesthetically pleasing finish desired by the client given their recent overall investment.
The Fibrelite technical engineering teams created a retrofit composite covering solution.
This northern airport now has an access solution that will continue to perform for the years to come.
Author: