On this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreOn this flood defence site, the previously installed steel access plates which were used to securely stow away flood defence doors had deformed which, together with their weight...
Read MoreApproximately 625 metres of custom designed and manufactured Fibrelite GRP trench covers and frames were specified for this project at one of the UK’s largest power stations...
Read MoreWith a fleet of 200 buses stationed, serviced, and refuelled at MPK Poznan depot in Poland, the Poznan Municipal Transport Company required an easy access covering solution…
In order to utilize the power generated by nearly 30,000 solar panels installed on 150 acres of unused farmland in southeastern Connecticut, a regional utility needed to install…
In this project we were approached by an OEM who provides Onshore Power Supply (OPS) systems, to quote for this large leisure cruise terminal upgrade project.
Fibrelite’s custom lightweight F900 (90-ton (90-tonne load rated) FRP GRP trench covers were specified for this Northern Irish container port over new cable anchor pits for the gantry cranes.
Maintenance staff required easy, safe access to these new cable anchor pits. Fibrelite trench access covers were specified on the consultant design engineers’ tender drawings to facilitate this.
Communication between the Fibrelite technical team, the third-party contractor and the design consultant enabled Fibrelite to custom engineer, manufacture and supply a unique trench covering arrangement which would meet all the specific design criteria for this project, including the demands of this harsh operating environment.
The easy access solution provided by Fibrelite ensures there is no need for specialist personnel or machinery during maintenance or operation.